Moana Casino Review
Verified RTP, real bonuses, complaints, and payment details.
Moana Casino RTP: from 90.5% to 97.30%
Moana Casino lowers the RTP
Moana Casino Details
Moana Casino
2025
English, Finnish, French, German, Italian, Norwegian, Portuguese
Curacao Gaming Control Board
Famagousta B.V.
Live Chat (24/7)
Yes
Bank Wire Transfer, Revolut, Paysafecard, Rapid Transfer, Skrill, Mastercard, Visa, Neteller, CASHlib, CashtoCode, MiFinity, Apple Pay, Google Pay, Luxon Pay, Flexepin, Bitcoin, Bitcoin Cash, Ethereum, Tether, Litecoin, USD Coin, Jeton, Neosurf
CA$40
Bank Wire Transfer, Jeton, MiFinity, Bitcoin, Bitcoin Cash, Ethereum, Tether, Litecoin, USD Coin, Luxon Pay, Neteller, Rapid Transfer, Skrill
CA$180
CA$750 per day, CA$10,500 per month
Pending: 0-5 days
Canadian dollars, Euros, US dollars, Norwegian kroner, Brazilian reals, British pounds, New Zealand dollars, Australian dollars, Bitcoin, Bitcoin Cash, Ethereum, Tether, Litecoin, USD Coin
Slots, Roulette, Blackjack, Bingo, Baccarat, Live Casino, Crash Games, Sports Betting
Amatic Industries, Apollo Games, Avatar UX, BF Games, Belatra, Betsoft, BGaming, Booming Games, Booongo Gaming, Caleta Gaming, Concept Gaming, Endorphina, Espresso Games, Evoplay, Fazi, Felix Gaming, Fugaso, GameArt, Gameplay Interactive, Gamevy, Gaming Corps, Gamzix, Genesis Gaming, Habanero, Hacksaw Gaming, Inbet Games, KA Gaming, Kalamba Games, Leap, Mancala Gaming, Mascot Gaming, Games Global, NetEnt, NetGame, Netgaming, Nolimit City, Novomatic, Nucleus Gaming, 1spin4win, 1x2games, Onetouch Games, Onlyplay, Peter & Sons, Pocket Games Soft, Platipus Gaming, Play'n GO, Playson, Playtech, Pragmatic Play, Quickspin, Red Rake Gaming, Red Tiger Gaming, Reevo, Rogue, 7mojos, Smartsoft Gaming, Spade Gaming, Spinmatic Entertainment, Spinomenal, Spinoro, Tada Gaming, 3 Oaks Gaming, Tom Horn Gaming, Triple Profits Games, Triple Cherry, Truelab Games, Vibra Gaming, Yggdrasil Gaming, Zeus Play
Yes
Yes
Facebook, X, Instagram, Telegram, YouTube, TikTok
Yes
Sports Betting
Deposit Limit Tool, Loss Limit Tool, Wager Limit Tool, Session Timer, Reality Check, Cool Off / Time-Out Tool, Self-Exclusion Tool, Self-Assessment Test
Community about Moana Casino
Latest player review highlights
Short previews of recent player feedback. Full reviews, replies and ratings are available in the player reviews section below.
Money withdrawal speed
Shows how players rate the casino's cash-out timing after a withdrawal request is submitted.
Account verification speed
Shows how players rate the time needed to complete account checks and verification requests.
Pros and Cons of Moana Casino
- Vast selection of games, including slots, table games, and sports betting
- Reputable software providers ensuring quality gameplay
- 24/7 customer support with live chat and email assistance
- Licensed by the Malta Gaming Authority for security and fairness
- Mobile-friendly gaming experience
- Expected wagering requirements on deposit bonuses
- Withdrawal processing time of up to three business days
- Limited information on VIP or loyalty programs
Casino Bonuses
Bonuses and promotions are among the biggest draws at any online casino, offering exciting incentives for both new and existing players. Most platforms provide generous welcome packages, often including deposit bonuses and free spins. At Moana Casino, the expected minimum qualifying deposit for these promotions will likely range between C$10 and C$20. Some casinos also offer cashback deals, which either come with no wagering requirements or a minimal rollover of up to five times.
When it comes to bonus conditions, the most favourable wagering requirement is around 40 times the bonus amount, with a standard maximum bet of C$5 while fulfilling these terms. Ideally, players should have 30 days to meet the rollover, ensuring enough time to play without unnecessary pressure. Some casinos also feature wager-free promotions, but these often come with a maximum winnings conversion, meaning that only a portion of your total earnings can be withdrawn.
Typically, slot games contribute 100% toward fulfilling wagering requirements, while virtual and live table games contribute at a lower rate. At L.C.S. Limited’s casinos, a small percentage of bets on table games may count toward rollover, giving players additional flexibility in how they meet bonus conditions.
Games
Slot enthusiasts can look forward to a diverse selection, including regular, jackpot, and Megaways slots. Additionally, the casino is likely to offer crash games, which have gained popularity for their instant-win mechanics. The live casino section is anticipated to include classic table games such as Blackjack, Roulette, Baccarat, and Poker, along with engaging Game Shows.
Sports
For sports betting fans, Moana Casino is expected to provide pre-match and live betting options on major sporting events. Virtual sports and Esports lovers will also have a place at Moana, with potential coverage of games like CS:GO, Dota 2, and League of Legends. The estimated game count stands at over 3,000 total games, with 2,800 available on mobile and around 90 live dealer games.
Slots
Among the popular slot titles expected at Moana Casino are 6 Jokers, Vicky Ventura, Spy Rise, Wild West Duels, Aliya’s Wishes, and The Greatest Train Robbery. These games, known for their engaging gameplay and rewarding features, are set to provide an entertaining experience for players.
Game Providers
To ensure a high-quality gaming experience, Moana Casino is anticipated to collaborate with some of the most reputable software providers in the industry. This includes leading developers such as BetSoft, Big Time Gaming, ELK Studios, Evolution Gaming, iSoftBet, Microgaming, NetEnt, Play’N Go, Playtech, Pragmatic Play, Quickspin, Red Tiger, Thunderkick, and Yggdrasil. With such a strong lineup, players can expect top-tier graphics, smooth mechanics, and fair gameplay.
Payment Methods
For smooth transactions, Moana Casino is likely to support a variety of deposit and withdrawal methods. Based on other casinos operated by L.C.S. Limited, we expect payment options to include Visa, Mastercard, Skrill, Neteller, Paysafecard, Astropay, Interac, and Neosurf. The minimum deposit will likely be set at C$10, while withdrawals will require a minimum of C$25. The maximum withdrawal limit is expected to be C$7,000 per month, with processing times of up to three business days. Additionally, players may need to wager their deposits three times before requesting a withdrawal to comply with Anti-Money Laundering regulations.
Security and Fairness
Security and licensing are crucial factors in establishing trust, and Moana Casino will be operated by L.C.S. Limited under the strict regulation of the Malta Gaming Authority (MGA). This ensures player protection through secure transactions, fair gaming practices, and adherence to responsible gambling measures. Players will have access to tools such as deposit limits, session timers, and self-exclusion options. With a trust score of 7.5/10 and availability in over 30 countries, Moana Casino is poised to offer a safe and reliable gaming environment.
Moana Casino Screenshots
Customer Support
Customer support is another essential feature, and Moana Casino is expected to provide 24/7 assistance. Players will have access to live chat for quick resolutions and email support for more detailed inquiries, including document verification for KYC procedures.
Checking the RTP of a casino is the best way to understand how fair the game is and what are the chances of players winning. Today, we have analysed the slots from various providers at Moana Casino in detail and are ready to provide an unbiased review.
AvatarUX RTP
Let's start with the provider AvatarUX, where serious reductions in RTP are immediately striking. In Cherrypop Deluxe, Cherrypop and Wildpops slots, the RTP was significantly lower than the standard indicators, have maintained their honest indicators.
-
Bountypop™ – RTP 96.2%
-
Cherrypop Deluxe™ – RTP 93.81% (normal 96)
-
Cherrypop™ – RTP 93.90% (normal 96.01)
-
Papayapop™ – RTP 96%
-
Poprocks™ – RTP 96.4%
-
Wildpops™ – RTP 94% (normal 96)
Bgaming RTP
But with BGaming, everything looks much better - proven slots show high RTP rates, and several games even exceeded 97%, which indicates favourable conditions for players. It's great to see that at least one provider has not been manipulated at this casino.
-
Alice Wonderluck – RTP 97.03%
-
Alien Fruits – RTP 95.97%
-
All Lucky Clover – RTP 97%
-
Aloha King Elvis – RTP 94.98%
-
Aztec Clusters – RTP 97%
-
Beast Band – RTP 96.88%
Endorphina RTP
Here, too, there are no complaints – all slots showed stable RTP values, which suggests that Moana Casino does not interfere with the settings of games from this provider. Players can expect fair conditions with no hidden surprises.
-
Fortune Snake – RTP 96.07%
-
Hell Hot 100 – RTP 96.7%
-
Joker Stoker – RTP 96.07%
-
Jolly Santa – RTP 96.06%
-
Mr Jingle Bells – RTP 96.01%
-
Power Balls – RTP 96.12%
Evoplay RTP
But here the situation is completely different. The RTP in the tested slots turned out to be at a critically low level - only 92% instead of the standard 96%.
-
Ace Round – RTP 92% (normal 96.62)
-
Elven Princesses – RTP 92% (normal 96)
-
Fruit Super Nova 100 – RTP 92.02% (normal 96.01)
-
Hot Triple Sevens – RTP 92% (normal 96)
-
Inner Fire Bonus Buy – RTP 92% (normal 95.9)
-
Mega Greatest Catch – RTP 92.1% (normal 96)
Fugaso RTP
We are pleased with the stability – none of the tested slots found a decrease in RTP. It can be seen that this provider has not undergone any changes, and players can safely spin the spins, knowing that their chances are not artificially low.
-
9 Dragon Balls – RTP 96.1%
-
Almighty Hot Wins – RTP 96.50%
-
Arctic Coins – RTP 96%
-
Book Of Anime – RTP 97%
-
Cash Busters – RTP 97.30%
-
City Pop Hawaii – RTP 96%
Mascot RTP
In some slots, RTP decreases were found - for example, Bamboo Bear and Ice Number One do not meet the standard indicators. However, not all of the provider's games have undergone changes - some slots have retained an honest RTP, which leaves a small chance for fair play, but you should not trust completely.
-
243 Fruity Zen – RTP 95%
-
3 Corsairs – RTP 95.21%
-
Aloha Tiki Bar – RTP 93.9% (normal 95.2)
-
Bamboo Bear – RTP 95.16% (normal 97.2)
-
Ice Number One – RTP 94% (normal 95)
-
Zeus The Thunderer Deluxe – RTP 95%
Netent RTP
Almost the entire list of slots from NetEnt looks good, but Steam Tower turned out to have a serious decrease in RTP - its standard value was cut, which makes the game much less profitable.
-
Ghost Pirates – RTP 96.03%
-
Happy Riches – RTP 96.03%
-
Hotline 2 – RTP 96.05%
-
Long Pao – RTP 96.03%
-
Starburst – RTP 96.09%
-
Steam Tower – RTP 95.07% (normal 97.04)
Platipus RTP
There are stable indicators here - not a single decrease was found, which is encouraging. Moana Casino doesn't seem to interfere with this provider's settings, so Platipus fans can play without fear.
-
1000 X Rush New – RTP 96.35%
-
10000 X Rush New – RTP 96.10%
-
1001 Spins – RTP 95%
-
4 Numbers New – RTP 96%
-
7 & Hot Fruits – RTP 95%
-
9 Gems – RTP 95%
Pragmatic Play RTP
One of the most popular providers has shown stable results – all tested slots have an RTP above 96%, and some even exceed this threshold. There are no hidden pitfalls here, and fans of Pragmatic slots can feel confident.
-
5 Lions Megaways 2 – RTP 96.50%
-
Gates Of Olympus 1000 – RTP 96.50%
-
Joker's Jewels – RTP 96.5%
-
Sugar Rush – RTP 96.50%
-
Sweet Bonanza 1000 – RTP 96.53%
-
Sweet Bonanza – RTP 96.6%
Red Tiger RTP
And here is an unpleasant surprise - a decrease in RTP was found in all tested Red Tiger slots. No exceptions. This is one of those cases where the casino clearly does not give players a chance to play fairly, cutting returns in literally every slot. If you like Red Tiger games, then it is better to look for another casino.
-
Aurum Codex – RTP 92.74% (normal 95.7)
-
Bugsy's Bar – RTP 92.77% (normal 95.74)
-
Fortune House – RTP 93.13% (normal 95.8)
-
Red Hot Bbq – RTP 92.67% (normal 95.66)
-
Reel Keeper Power Reels – RTP 92.72% (normal 95.73)
-
Wrigley's World – RTP 92.71% (normal 95.72)
Yggdrasil RTP
Another provider that has suffered from hard RTP cuts. Half of the tested slots were underestimated, and some were at a critically low level, only 90.5% instead of the standard 96%. This makes the game almost useless in terms of chances of winning. Unlike other providers, the situation here is really catastrophic.
-
9 Arrows Of Odysseus – RTP 94%
-
Barbarossa Doublemax – RTP 90.5% (normal 96.2)
-
Golden Gorgon – RTP 96%
-
Shark Bait – RTP 90.5% (normal 94)
-
Valley Of The Gods – RTP 90.5% (normal 96.2)
-
Vikings Go Berserk – RTP 90.5% (normal 96)
Is it possible to win at Moana Casino?
Objectively, there are chances, but they depend on the choice of slots. In some providers, such as BGaming, Endorphina, and Platipus, the RTP rates have remained unchanged, which means that you can play them without fear. However, if you randomly choose slots from Evoplay, Red Tiger or Yggdrasil, then it will be almost impossible to win, because their RTP is reduced to critical values.
Overall, the situation at Moana Casino is mixed. Some slots give players fair odds, but in some cases, the casino has clearly interfered with the RTP settings. If you choose the right games, then the chance of winning remains, but you should do it with extreme caution.
Most Popular Slots at Moana Casino
Explore the most popular slots from Moana Casino right here in demo mode. Test the top-performing games for free to discover their bonus features and mechanics.
the island theme is nice, all blue water and tiki stuff, my kid loves that disney film so the name made me smile. anyway the casino itself is grand, played a few of the Play n Go slots, had a small win, took 110 out by card and it landed in two days fine. support answered quick when i messed up my password. its a perfectly decent place, the ocean theme is the standout, everything else is just standard. three from me
I think you should stay away from this place because they literally steal your money. You can deposit money but when it comes to withdrawing money you can never withdraw it. They offer you all the unexpected things.
The same old story with canceled winnings and stolen 435€ due to something they didn't want to specify. I am going to start the complaint here too.
help me solve the problem with a dishonest casino. I found this casino on your website and registered. I did not use the bonuses. I made deposits and played and lost with them. In total, I made deposits for 1250 dollars. But after I won the same money and my account was 1287 dollars, I decided to withdraw some of the money and ordered 500 dollars. They asked me to pass verification and I provided everything they asked for. After a few days, they sent me a letter that all the money was confiscated and that I violated their rules and they will return my last deposit of 280 dollars. And why only the last deposit, let them return all deposits in the amount of 1250 dollars. But the fact is that I did not violate anything, they accused me of using a VPN and photoshopping documents. I did not use a VPN, I explained to them that there is a war in my country and I am not in Ukraine at the moment, about Photoshop, I did not use it either. I can provide them with any document they ask for, I can video call them and show them my documents and where I live in real time. They are scammers, you should not play in this casino. Askgambler I ask you to remove them from your site, people should not suffer or be deceived. Thank you
I hope they offer some wager-free promotions. That would be a game-changer!
A wide selection of payment methods is a must for me. It’s great to see Interac on the list.
It’s a community widget — visit the Community tab for the full experience.
Moana Casino is shaping up to be a promising new online gambling destination with an extensive game selection, strong security measures, and diverse payment options. Whether you're a fan of slots, live dealer games, sports betting, or Esports, Moana Casino is likely to provide an engaging gaming experience.
- Promotional claims are checked against current terms, including bonus rules, deposit requirements and eligible-game conditions where available.
- Game and RTP notes are based on visible player-facing information, such as provider data, game-info screens and our detailed RTP checks.
- Banking details are reviewed separately from marketing copy, with payment methods, payout limits, fees and verification steps treated as factual checks.
- Safety notes stay conservative and evidence-led, covering licence information, player restrictions, safer-gambling tools and unresolved risk signals.
Published by Sabine Schnabel on March 5, 2025.
FAQ
Yes, Moana Casino is expected to be licensed by the Malta Gaming Authority (MGA), ensuring a safe and fair gaming environment. The casino will also implement responsible gambling tools and data encryption to protect players’ information.
Moana Casino will likely provide a generous welcome bonus, free spins, cashback offers, and ongoing promotions for both new and existing players. The exact terms, including wagering requirements, will be available upon launch.
Withdrawal processing times are expected to take up to 3 business days, depending on the chosen payment method. Popular options like e-wallets may have faster payouts compared to bank transfers or card withdrawals.
Yes, Moana Casino will be fully optimised for mobile gaming, allowing players to enjoy slots, table games, and live dealer experiences on both iOS and Android devices without needing to download a separate app.
Our Reviews of Other Casinos
Explore detailed insights on a wide range of online casinos, featuring expert reviews with RTP verification, along with authentic player ratings and feedback.