Sons of Slots Casino Review
Verified RTP, real bonuses, complaints, and payment details.
Sons of Slots Casino RTP: from 84% to 96.71%
Sons of Slots lowers the RTP
Sons of Slots Casino details
Sons of Slots
2020
1x2 Gaming, Ainsworth, Bally, Barcrest, Big Time Gaming, Blueprint Gaming, Evolution Gaming, Ezugi, Foxium, Gamomat, Habanero, iSoftbet, Kalamba Games, Lightning Box Games, NetEnt, NextGen Gaming, Nolimit City, Oryx Gaming, PariPlay, Play'n GO, Playson, Pragmatic Play, Rabcat, Red Rake Gaming, Red Tiger Gaming, Tom Horn, Wazdan, Just For The Win, Stakelogic, Hacksaw Gaming, Booming Games, Golden Hero Games, Betsoft, Amatic Industries
Android, iPad, iPhone, Windows, Mac












Chat, E-mail
AUD, BRL, CAD, EUR, GBP, USD
Community about Sons of Slots
Latest player review highlights
Short previews of recent player feedback. Full reviews, replies and ratings are available in the player reviews section below.
Money withdrawal speed
Shows how players rate the casino's cash-out timing after a withdrawal request is submitted.
Account verification speed
Shows how players rate the time needed to complete account checks and verification requests.
Pros and Cons of Sons of Slots
- MGA licence
- Predatory withdrawal terms
- 1x deposit rollover before withdrawal
Welcome Bonus offer
As of this writing, Sons of Slots is giving you 50 free spins on Aloha Cluster Pays by NetEnt in addition to a 50% match deposit bonus up to C$400. Let's see if the welcome bonus is still worthwhile despite being somewhat meagre in comparison to the 100% match deposit bonuses most casinos provide.
You must make a minimum deposit of C$20 and fulfil a 50x (deposit + bonus) wagering requirement within 7 days in order to be eligible to receive the welcome bonus. With all due respect, such a requirement is excessive for casual players.
Numerous casinos just need a rollover requirement for bonus funds. You must play through both your deposit and withdrawal 50 times at Sons of Slots, which technically implies you must wager x100.
Game Choice
Despite the fact that the casino is called Sons of Slots, be careful. Table games and live casino games are also available. The casino now collaborates with a small number of game developers, but it is hoped that additional studios will sign collaboration agreements with it. There are about 600 games in the collection, most of which are slots.
Play games from NetEnt, NYX, Evolution, Quickspin, Yggdrasil, iSoftBet, and Ganapati at Sons of Slots Casino.
Deposits and Withdrawals
In addition to Visa, MasterCard, EcoPayz, Skrill, Trustly, Neteller, paysafe, MuchBetter, zimpler, sofort, iDebit, Instadebit, Siru, and Interac, Sons of Slots Casino also offers these payment options. The minimum withdrawal is C$20 and the minimum deposit is C$10.
You must deposit at least C$20 to be eligible for a welcome bonus. But, you must have made a first deposit of at least C$30 in order to be able to submit a withdrawal request. What's more, all deposits come with a 1x rollover requirement meaning that you need to keep playing until you burn up your funds. If you eventually have a quantity equal to or greater than the C$20 minimum withdrawal requirement, you may then request a withdrawal.
Deposit Methods
Bank transfer, ecopayZ, iDeal, Instadebit, Interac, Maestro, MasterCard, MuchBetter, Neteller, Paysafe, Siru Mobile, Skrill, Sofortüberweisung, Visa, zimpler.
Withdraw Methods
Bank transfer, ecopayZ, iDeal, Instadebit, Interac, Maestro, MasterCard, MuchBetter, Neteller, Siru Mobile, Skrill, Sofortüberweisung, Visa, zimpler.
Sons of Slots Screenshots
Licencing and security
The website SonsofSlots.com is run on the Bethard Group Ltd. platform and is a trademark of Evoplay Limited.
The MGA regulates the Sons of Slots' services, thus the casino should be regarded as secure and trustworthy, yet the aforementioned withdrawal restrictions give us the right to doubt its honesty. The game categories for the majority of online casinos are often found at the top of the home page, followed by the general terms and bonus conditions at the bottom. The main page of Sons of Slots provides a brief overview of the games, payment options, and bonuses offered, but we had trouble locating the terms and conditions. So, although not being subject matter experts, we would suggest improving the navigation.
You can test out mobile casino slot games in demo mode without creating an account to verify if they function properly on your smartphone. We had no crashes or freezes when playing the games we tried.
Welcome to our comprehensive review of RTP (Return to Player) at the online casino Sons of Slots. We have carefully examined offerings from various slot providers to provide you with all the necessary information for making informed decisions when choosing games. RTP is a key indicator that affects your chances of winning, and we aim to provide you with up-to-date and accurate information.
Elk Studios RTP
Elk Studios at Sons of Slots offers games with relatively low RTP, although this is the highest achievable rate. For instance, "Dead Man's Gold" and "Nitropolis 4" both have an RTP of 94%. This creates conditions where winning in these games becomes quite challenging. Players may want to consider other options for a more profitable gaming experience.
-
Dead Man's Gold – RTP 94%
-
Dream Diver – RTP 95%
-
Katmandu X – RTP 95%
-
Nitropolis 4 – RTP 94%
-
Sumo Sumo – RTP 94%
-
Tropicool 2 – RTP 94%
Endorphina RTP
Endorphina, on the other hand, offers games at Sons of Slots with higher RTP. "Book Of Vlad" and "Dynamite Miner" both have an RTP of 96.01%, which is a favourable rate for this casino. This provides players with fair and rewarding gaming conditions.
-
Book Of Vlad – RTP 96.01%
-
Dynamite Miner – RTP 96.01%
-
Glory Of Egypt – RTP 96.05%
-
Lumber Jack – RTP 96.07%
-
Minotaurus – RTP 96.04%
-
Temple Cats – RTP 96.05%
Hacksaw Gaming RTP
Hacksaw Gaming in Sons of Slots poses a significant challenge for players due to reduced RTP in some of their games.
-
Benny The Beer – RTP 92.28% (normal 96.17)
-
Colours – RTP 92% (normal 96)
-
Densho – RTP 92.33% (normal 96.33)
-
Le Bandit – RTP 92.17% (normal 96.34)
-
Sleepy Grandpa – RTP 92.32% (normal 96.23)
-
Vending Machine – RTP 92.32% (normal 96.28)
Iron Dog RTP
Iron Dog follows the trend of reduced RTP in Sons of Slots. "Gods Of Olympus 2" and "Luck Of The Dragon" have an RTP of 91.3%, significantly diminishing players' chances of winning.
-
Fruity Megaways – RTP 94.12% (normal 96.06)
-
Gods Of Olympus 2 – RTP 91.3% (normal 96.11)
-
Halloween Horrors Megaways – RTP 94.5% (normal 96.15)
-
Luck Of The Dragon – RTP 91.3% (normal 95.14)
-
Savannah Strike – RTP 94.1% (normal 96.05)
-
Sweet Candy Cash – RTP 93.1% (normal 95.18)
Kalamba RTP
Kalamba stands out with its high RTP, providing Sons of Slots players with excellent opportunities to win.
-
Atlantis Thunder – RTP 96.66%
-
Firedrakes Fortune – RTP 96.13%
-
Joker Max – RTP 96.10%
-
Joker Times Xmas Edition – RTP 96.19%
-
Mammoth Chase Easter Edition – RTP 96.94%
-
Pharaohs Reign – RTP 96.58%
Netent RTP
Sons of Slots offers NetEnt slots with high RTP. Games like Fruit Shop Christmas and Secrets Of Christmas demonstrate RTP above 96%.
-
Fruit Shop Christmas – RTP 96.71%
-
Gonzos Quest – RTP 95.97%
-
Gordon Ramsay Hells Kitchen – RTP 96.07%
-
Irish Pot Luck – RTP 96.06%
-
Secrets Of Christmas – RTP 96.72%
-
Starburst – RTP 96.09%
Nolimit City RTP
Nolimit City at Sons of Slots offers games with reduced RTP, putting players at a disadvantage. "The Cage" and "True Kult" have RTP values of 92.09% and 92.10%, making winning in these games highly unlikely.
-
Dj Psycho – RTP 94.09% (normal 96.05)
-
Space Donkey – RTP 94.13% (normal 96.07)
-
The Cage – RTP 92.09% (normal 96.05)
-
The Crypt – RTP 94.01% (normal 96.05)
-
True Kult – RTP 92.10% (normal 96.06)
-
Ugliest Catch – RTP 94.19% (normal 96.11)
Pragmatic Play RTP
Pragmatic Play offers Sons of Slots players games with high RTP, creating favourable gaming conditions.
-
Big Bass Crash – RTP 96.50%
-
Cyclops Smash – RTP 96.05%
-
Gold Oasis – RTP 96.06%
-
Infective Wild – RTP 96.09%
-
Tundras Fortune – RTP 96.04%
-
Twilight Princess – RTP 96.08%
Red Tiger RTP
However, Red Tiger slots in Sons of Slots raise concerns. The decrease in RTP in games questions the transparency and fairness of the casino, reducing players' chances of fair winnings.
-
10001 Nights – RTP 92.65% (normal 95.73)
-
Cash Volt – RTP 92.76% (normal 94.78)
-
Lucky Easter – RTP 93.21% (normal 95.24)
-
Lucky Halloween – RTP 93.17% (normal 95.07)
-
Midas Gold – RTP 93.03% (normal 95.22)
-
Pirates Plenty – RTP 92.73% (normal 95.12)
Wazdan RTP
Wazdan maintains high standards in Sons of Slots, offering games with RTP exceeding 96%.
-
12 Coins – RTP 96.13%
-
16 Coins – RTP 96.18%
-
9 Coins Grand Diamond – RTP 96.15%
-
Back To The 70's – RTP 96.47%
-
Bars&7s – RTP 96.43%
-
Beach Party Hot – RTP 96.24%
Play'n Go RTP
Unfortunately, Play'n Go presents a significant threat to Sons of Slots players due to a considerable reduction in RTP in their games. "Honey Rush 100" and "Piggy Blitz" have an RTP of only 84%, making it nearly impossible for players to win.
-
Honey Rush 100 – RTP 84% (normal 96.20)
-
Piggy Blitz – RTP 84% (normal 96.25)
-
Return Of The Green Knight – RTP 84% (normal 96.27)
-
Ruff Heist – RTP 84% (normal 96.19)
-
Scales Of Dead – RTP 84% (normal 96.21)
-
Temple Of Prosperity – RTP 84% (normal 96.2)
Is it possible to win at Sons of Slots?
Sons of Slots offers a wide range of games from various providers, but it's crucial to carefully select which slots to play. Games from Kalamba, Pragmatic Play, and Wazdan offer high RTP and fair conditions for players, while slots from Hacksaw Gaming, Iron Dog, and Play'n Go may pose a risk due to reduced RTP. It's always essential to stay informed and make informed choices to maximise your chances of success at Sons of Slots.
Most Popular Slots at Sons of Slots
Explore the most popular slots from Sons of Slots right here in demo mode. Test the top-performing games for free to discover their bonus features and mechanics.
Played on it for years but when it came to a big payout, it was obstructive. I played on this site for years, but when it came to a big payout, it became very obstructive. It was truly disgusting, considering I had been a member for years. Stay away from this casino.
Sons of Slots is an excellent betting site with a lot to offer. Their odds are consistently good and their platform is very user-friendly. I also appreciate that they have a dedicated mobile app.
I love playing at Sons of Slots. The games are great, and the bonuses are generous. The customer support team is also very helpful.
Drake disappoints me by promoting this hoax! I'm from Vancouver and enrolled there for the stated free 222 spins up to $1000.00 for Canadians, but as soon as I made my account, the offer vanished, and I was suddenly only eligible for 22 free spins if I made a deposit first. I spent $10 and played a few slots, but I was still unable to locate the 22 free spins. What a fraud! Prevent at all costs! Return my $10, please!
It’s a community widget — visit the Community tab for the full experience.
Sons of Slots appears to check all the proper licence and security boxes at first glance, but deeper inspection reveals that it is one of the casinos that never lets you win. That is not the ideal choice for you, especially if you occasionally want to pay out big wins and bonuses.
- Promotional claims are checked against current terms, including bonus rules, deposit requirements and eligible-game conditions where available.
- Game and RTP notes are based on visible player-facing information, such as provider data, game-info screens and our detailed RTP checks.
- Banking details are reviewed separately from marketing copy, with payment methods, payout limits, fees and verification steps treated as factual checks.
- Safety notes stay conservative and evidence-led, covering licence information, player restrictions, safer-gambling tools and unresolved risk signals.
Published by Mike Collins on March 23, 2023.
FAQ
About the Sons of Slots, we have conflicting emotions.
The website states that withdrawals are processed quickly, unless it's your first withdrawal, in which case it can take 24 hours.
As the name suggests, the majority of the games available are slots, but there are also a tonne of table games and live casino games.
Yes, most games are playable on Android and iOS devices, but for best performance, you’d better update your OS and browser to the latest version.
Our Reviews of Other Casinos
Explore detailed insights on a wide range of online casinos, featuring expert reviews with RTP verification, along with authentic player ratings and feedback.